The main steps towards gaining a permit to construct your ADU are as follows.

Gather materials for the building permit application.

1

Meet with City Plan for a pre-submission meeting.

2

Revise your application materials post-meeting and submit the application through City Squared.

3

Submit your notarized deed restriction to the city clerk’s office.

4

How To Use City Squared

Materials for Building Permit Application

For more information on each component of the application, refer to the links included with each description.

All documents must be submitted through City Squared; the signed and notarized Deed Restriction must also be submitted to the City Clerk’s Office.

The deed restriction, affidavit of residence, and zoning table can be found on the Resources page of this toolkit.

Documents

Drawings must be at least 8.5 x 11”, and at a scale no smaller than 1/16” = 1’-0”. A sample drawing set can be found on the Resources page of this toolkit.

Drawings and Photographs